Well, I can easily do this for you. But 1,000 images ... it will be a lot of work and take time.
I could probably do one every 3 minutes, for those that have no problems.
This includes:
– load it
– size it, if necessary
– crop it
– name it
– export it
For those that do not seem clear and I must find image myself, probably 5, maybe even 10 minutes.
Assuming that happens 10% of the time (1 for every 10 images; 100 of the 1,000),
and assuming half of them take 5 minutes and half take 10 minutes...
just these 10% will take 750 minutes.
The other 900 images, assuming 3 minutes per, will add another 2,700 minutes.
In total, that is 3,450 minutes of working time ... OK, let's say 3,400.
Damn! That's 57 hours!
OK, let's assume I have interruptions or computer glitches, so we call it 60 hours, OK?
Can you pay enough for me to work five 12-hour periods?
3,000 INR will not be enough. 3,000 INR = $36 USD. For low wage, that is only 3.5 hours, not 57.
So, please see my bid and let me know.