Modelling simulation using tecnomatix plant simulation 15

Imefungwa Ilichapishwa Miaka 2 iliyopita Kulipwa wakati wa kujifungua
Imefungwa Kulipwa wakati wa kujifungua

Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

Manufacturing Engineering

Kitambulisho cha Mradi: #30620675

Kuhusu mradi

Pendekezo 1 Mradi wa mbali Ipo mtandaoni %project.latestActivity_relativeTime|badilisha%

Wafanyakazi huru 1 wanaweka zabuni ya kadri ya $200 kwenye kazi hii

wtomazini13

Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks

$200 USD kwa siku 10
(Maoni 0)
0.0