Find Jobs
Hire Freelancers

Required: preliminary Primavera "P6" Schedule, Outline HS&E plan and QA/QC credentials.

$30-250 USD

Imefungwa
Imechapishwa over 4 years ago

$30-250 USD

Kulipwa wakati wa kufikishwa
I require: 1- preliminary Primavera "P6" Schedule (only preliminary based on the attached bill of quantities) 2- Organzational chart (attached but needs to be re-done in presentable way) 3- Outline HS&E plan (standard for construction projects) 4- QA/QC credentials. (standard for construction projects) Should be easy job as the required schedule is preliminary not full details, other documents are standard and should be ready as it's used in any construction project.. My budget is 100$ and required within 2 days
Kitambulisho cha mradi: 22299548

Kuhusu mradi

13 mapendekezo
Mradi wa mbali
Inatumika 4 yrs ago

Unatafuta kupata pesa?

Faida za kutoa zabuni kwenye Freelancer

Weka bajeti yako na muda uliopangwa
Pata malipo kwa kazi yako
Eleza pendekezo lako
Ni bure kujiandikisha na kutoa zabuni kwa kazi
13 wafanyakazi huru wana zabuni kwa wastani $99 USD kwa kazi hii
Picha ya Mtumiaji
Hello, I’m a mechanical engineer with a project management background in the fields of planning and scheduling projects in the disciplines of mechanical, civil, electrical, and IT projects. I utilize software such as MS Project (All versions), Primavera P3, P6, ProjectLibre, and Excel. I can start project schedules from scratch, create WBS, dependencies, resource loading, and cost loading. Utilizing the CPM method, reporting, analyzing, and claims. I can complete the project for you. Regards, Hany Estefanos
$140 USD ndani ya siku 7
5.0 (41 hakiki)
5.1
5.1
Picha ya Mtumiaji
Hello Sir/Madam, My name is FATIMA and writing is my passion “When I say work, I only mean writing. Everything else is just an odd job”. From my early age, I enjoyed reading novels and stories, as I was growing up it has become my passion now. I am professionally active in the field of writing since 2010 for my clients on different platforms. Thank you
$30 USD ndani ya siku 1
4.2 (3 hakiki)
1.9
1.9
Picha ya Mtumiaji
Hi! I have checked your requirements on this research work. Do you have any additional instruction sheet? Do you have any reference materials? I know how to draft a plan that is not only free from plagiarism but also secures the best outcome. I can assure you a quality work AND I won't leave you until your objectives are achieved. I am confident to deliver my best possible. Please come via chat so I can share some of my past work with you and discuss it more. Thanks, Tiana
$100 USD ndani ya siku 2
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
Greetings, I am highly a qualified person with lots of professional expertise. I have served countless clients with complete level of satisfaction. I want you to hire me and check my level of expertise. I ensure you I will not let you down and you will like my work. :) waiting.
$30 USD ndani ya siku 1
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
i am planning eng for 10 years,i have experience in this projects,i ended the PMP course and i worked for international companies
$166 USD ndani ya siku 2
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
From the BOQ, I think we're talking about a car parking of 3 stories underground + ground floor with expected average of 2,600 m2/floor, and with smart LC systems CCTV, VMS, BMS & BAS. Although I have a feeling about the accuracy of the MEP quantities. Anyway, If you choosed us by today, I'll give you this Sunday (EOB; before end of the business day) what you require. furthermore - if you need - later on you may send me all the related drawings, and I'll give you a complete take-off along with a full detailed primavera schedule in less than 2 weeks loaded with necessary resources. our work is always to the utmost accuracy.
$90 USD ndani ya siku 2
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
i have reviewed the documents you have attached and understood the scope of work. i might need some architectural drawings in process of making schedule. i can get your task done as per your requirements.
$70 USD ndani ya siku 3
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
Hi, I had been worked in Kuwait.I have 24 years of experience in Project planning and prepared EPC schedules for the project.I can supply a highlevel plan and I need to know what will be the Client's target finish dates and an idea of how much labour available to you.
$100 USD ndani ya siku 7
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
Hello My name is Laila Alfazza’a and am a senior planning engineer from Jordan, I can help you with your project as I have a wide experience in Primavera schedules and I can submit a professional schedule to you within your budget and timescale. For further details please contact me.
$100 USD ndani ya siku 2
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
Am planning engineer with required requirements enable doing task in mean time Relevant Skills and Experience Primavera p6
$111 USD ndani ya siku 2
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
Please give a chance to do this work and give you this work within days scheduled if you agree with this bid.
$100 USD ndani ya siku 3
0.0 (0 hakiki)
0.0
0.0
Picha ya Mtumiaji
Hi hope you are fine. I am civil engineer and have 5 years of work experience in Planning and Management of Civil and MEP related Projects. I am currently working as a planning engineer and have very good command in Primavera P6 and all related software. I am interested to do this job for you as per your requirements.
$150 USD ndani ya siku 3
0.0 (0 hakiki)
0.0
0.0

Kuhusu mteja

Bedera ya KUWAIT
Al-Salmiyah, Kuwait
5.0
5
Njia ya malipo imethibitishwa
Mwanachama tangu Jun 14, 2012

Uthibitishaji wa Mteja

Asante! Tumekutumia kiungo cha kudai mkopo wako bila malipo kwa barua pepe.
Hitilafu fulani imetokea wakati wa kutuma barua pepe yako. Tafadhali jaribu tena.
Watumiaji Waliosajiliwa Jumla ya Kazi Zilizochapishwa
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Onyesho la kukagua linapakia
Ruhusa imetolewa kwa Uwekaji wa Kijiografia.
Muda wako wa kuingia umeisha na umetoka nje. Tafadhali ingia tena.