surveying terminology, instrumentation, computations for determining horizontal positions, elevations, and basic layout techniques of buildings and infrastructures.

Imekamilika Ilichapishwa Miaka 2 iliyopita Kulipwa wakati wa kujifungua
Imekamilika Kulipwa wakati wa kujifungua

• Carry out slope and sea level reductions

• Perform calculations to determine elevations

• Compute and adjust differential level loop

• Maintain field book data

• Create simple building and infrastructure layouts

• Create a layout using Total Station

• Present survey information in a drawing

• Point positioning and coordinates

• Benchmark and datum

• Properties of geometric spaces

• Leveling concepts

• Topographic surveying techniques

• Field exercise data collection

• Land elevation determination

• Traverse concepts

• Methods of surveying using Total Station

• Simple building and infrastructure layout

• Basic concepts of GIS

Engineering Mathematics AutoCAD

Kitambulisho cha Mradi: #32060594

Kuhusu mradi

9 mapendekezo Mradi wa mbali Ipo mtandaoni %project.latestActivity_relativeTime|badilisha%

Imetuzwa kwa:

(Maoni 2)
1.3

9 wafanyakazi huru wanazabuni wastani wa $86 kwa kazi hii

alaminabdo53

Dear Employer! I have read your project description, I'm an Esri certified expert in GIS and Remote sensing analysis with Surveying and Geoinformatics background. I have developed Multiple maps, index from drone data, Zaidi

$200 CAD kwa siku 3
(Maoni 0)
0.0
sharmadeep993

civil engineer / surveyor hello sir i am graduated in civil engineering from a reputed university and doing masters in structural engineering . so i better know the requirements of a surveyor for calculations of bearin Zaidi

$40 CAD kwa siku 3
(Maoni 0)
0.0
trhbehzade

Hi I am a civil engineer, I can help you in this project. we can discuss your needs clearly Best regards

$150 CAD kwa siku 7
(Maoni 0)
0.0
Luckyisaac

I am a professional Surveyor that have experience in Building Surveying, Basic survey computation and adjustment, topographic Surveying, use of Surveying instrument, reduction of field book and AutoCad. I can do your w Zaidi

$200 CAD kwa siku 5
(Maoni 0)
0.0
Priatna3cm

Angular error = 0-00-43 Angular error/set = 0-00-04 Over Elevation error : -0.0057 Error North : -0.0273 Error East : 0.1247 Absolute error : 0.1277 Error Direction : S 77-37-50 E Perimeter : 1459 Zaidi

$40 CAD kwa siku 7
(Maoni 0)
0.0